    Aksaray–Nevşehir junction: bituminous hot mix (asphalt) construction on the Camiliiören–Gülpınar–Gülağaç section.

  • Image

    Kozan–Feke–Saimbeyli 6th Regional Boundary Road, Km 2+000–70+151 / 66+560–82+300: earthworks, engineering structures and superstructure (plant-mix sub-base, plant-mix base, surface dressing) — supplementary contract.

  • Image

    Balıkesir–Havran–Küçükkuyu road and Edremit ring road: earthworks, engineering structures and bituminous hot mix (asphalt) works on various sections.

  • Image

    Çanakkale Çan overburden stripping works.

  • Image

    Kastamonu–Araç road (Km 0+000–38+000): earthworks, engineering structures, superstructure (bituminous hot mix), guardrails and traffic works.

  • Image

    Bursa–İnegöl–Bozüyük 4th Regional Boundary Road, Km 81+700–100+256 and Km 0+000–17+380, and the Söğüt junction grade-separated interchange: engineering structures and bituminous hot mix works.

  • Image

    Mersin–Adana state highway, between the Atilla Altıkat grade-separated interchange and Km 59+290–68+750 (Hipodrom–Hiltonsa interchanges): earthworks, engineering structures, superstructure (bituminous hot mix) and traffic safety works (horizontal and vertical road marking, guardrails).

  • Image

    Installation of an ice detection and prevention system at the entrances and exits of the Drenas tunnel and the Havza tunnel.

  • Image

    Sivrihisar–Eskişehir–Bozüyük road wearing course (Km 291+730–297+100) and the Eskişehir–Bursa junction (Km 0+000–2+500): earth levelling, engineering structures, bridge, superstructure and bituminous hot mix works.

  • Image

    Kastamonu airport interchange, Km 0+000–6+000: earthworks, engineering structures, PMT, PMAT and bituminous hot mix; wearing course on the eastern ring road; underpasses at the eastern ring road connection interchange and at the Örencik village entrance.

  • Image

    Kastamonu provincial boundary – Karabük road.

  • Image

    Kaklık (Denizli) logistics centre: additional yard concreting, drainage channels, retaining and enclosure walls, loading ramp, logistics service building, extension of the existing platforms, culvert and three security cabins.

  • Image

    State road 750-11: Aksaray city crossing, Tacin underpass and junction rearrangement.

  • Image

    Base reinforcement and surface dressing works on the Ordu–Niksar Branch Directorate roads within the 7th Regional Directorate of Highways.

  • Image

    Block 7719, parcel 23: reinforced concrete framed structure, total construction area 4,184.59 m², building class 3/B.